The client wanted to install a solar PV system to reduce energy bills and decrease reliance on the grid, particularly after purchasing an electric vehicle (EV).
The goal was to maximise on-site renewable energy generation to support both household consumption and EV charging.
Project Design & Final Configuration:
The available roof space was optimised to accommodate a high-performing solar array, positioned to achieve the best possible generation based on orientation and layout.
Final system configuration:
12 × Trina Vertex S+ full-black solar panels
Huawei 5 kW hybrid inverter
Impact & Results:
Over 4,000 kWh of clean energy generated within 6 months.
Approximately 2 tonnes of CO₂ emissions avoided.
Equivalent to saving over 1.5 tonnes of coal.
More than 45% reduction in grid reliance.
This system has enabled the client to significantly lower energy costs while supporting sustainable EV charging, delivering both environmental and financial benefits.
Got a project in mind?
Find out if solar is right for your property or commercial project.
Complete our quick enquiry form and our team will provide tailored advice and next steps.